I do think they may just be doing lift tests... I haven't seen one train go over the lift yet...


Ripcord Crew 2002 / MF Crew 2004

And now the cam seems to not be refreshing! :(


Nick

Don't they need to practice rollback senarios incase of a power outage?


Top Coasters:
1) Millennium Force 2) Apollos Chariot 3)Wicked Twister 4)Top Thrill Dragster 5)Dueling Dragons

well if they are at this point in testing i personally think that they have already tested power outage senerios. I believe that the only element of the ride that they were worrying about getting the new track installed and making sure it works, and finishing up the state minimum required testing before riders will be allowed to ride. *** Edited 5/23/2007 10:10:37 PM UTC by NoSoup4U***

It's true the CP cam is no longer working (although it is stuck on an awesome pic with SRF's splash). After watching the funcam though for about 10-15 minutes, I'd say that they are only doing lift tests.


Thrills Around the Corner!

Loopy's avatar

If I didn't know any better I'd say, by the looks on the funcam, that they're using the crane to do some pull throughs.


eat. sleep. ride! - Coaster apparel and accessories!

Ride on, MrScott!

I would like to take a look, but it appears that we have some unexperienced people in control of the cam :(


Cedar Point Lifer, RideOp, Now Park Guest
2008 - Mantis/MF/Skyride
2009 - ATL Raptor
2010 - TL Sweeps
2011 & 2012 - Area 3 Rides Supervisor

DSShives's avatar

It was really entertaining watching the construction crew install that last piece of track today. Took them several hours using everthing from huge C clamps to beating it with a rubber sledge hammer.

What time did the last piece go in?

DSShives's avatar

They started the install of the last piece of track around 12:15. My wife and I were eating at Chick Fil-A when I saw the crane lifting up the last piece from behind the fencing. They finally had it in place around 2:00pm but were still working on getting all of the holes to line up. Hats off to the construction crew on that last piece. I saw Monte Jasper out walking around as well checking the progress of the install.

I had lunch today back at Chick-fil-A around 1:30 while they were cycling the trains on and off the track. I also saw the last piece go into place I think around 1:00. It did look like they were having alot of fun with that last piece.

Loopy's avatar

BGRooDoG,

The crane was moving from right to left (in the picture) at a rapid rate. It would pause all the way to the left and then move back to start all over again.


eat. sleep. ride! - Coaster apparel and accessories!

Ride on, MrScott!

crazy horse's avatar

Here is a video of the track being installed.

http://youtube.com/watch?v=Keb25zhDfh0


what you've just said is one of the most insanely idiotic things I have ever heard.
Everyone in this room is now dumber for having listened to it.
I award you no points, and may God have mercy on your soul.

Jason Hammond's avatar

I met up with an ACE'r from Toledo who was at the park all day. He said that the shots we saw of the train on the lift was just lift hill testing. It would roll up fast and then right at the top it would stop and then slowly roll back down.

Also, they did do a pull through with the Clearance board. However, it was not a train, but rather a set of casters designed to run on the track and hold the clearance board.

We were there til close and they hadn't run a train yet. But there were people in the station playing with the controls in the station an on the transfer track.

I'll post pictures shortly.


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

airee85's avatar

Thanks Jason for the information! You rock.


-Eric

Jason Hammond's avatar

Photo Update.

http://rollercoasterfreak.com/Cedar_Point/Maverick.html

The person in this picture and this picture (who ever he is) told my fellow ACE'r that they are hoping to open Saturday. My ACE buddie said he had a heavy accent. Could this be an IntaRide engineer? Sandor maybe? I have no idea what he or anyone there looks like. But he was the only one climbing around that didn't look like a construction worker.


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

After comparing to the video on cedarpoint.com, I'd say that it's a good possibility that it is Sandor.


Jeff Young

Looks a lot like Sandor.


Maverick=3 with 1 rollback
Screamsters 2003,04,05,06

Jason Hammond's avatar

A small side note: He drove up in the White truck in the first picture.


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

DSShives's avatar

I dont normally join in speculation....but I also did hear a construction worker say they were pushing hard for a Memorial Day Weekend opening. Take it with a grain of salt........Im sure Cedar Point took the position of "Under Promise....Over Deliver" in this case which means they are trying to open it earlier than "early June".

Im sure Cedar Point would love to have Maverick open for Memorial Day Weekend. Every day its down is lost revenue.