I understand what coolkid2345 is trying to say. It sucks because of one reason. Cedar Fair is in debt and therefore they only can spend so much without making their debt amount higher. So that means Cedar Point won't get something too expensive like they have in the past. We should be happy though, Cedar Point has 3 coasters though that have cost them 20+Million Dollars. Top Thrill Dragster, Millennium Force, and Maverick.
Well i believe last,maybe the year before that Cedar Fair built 4 coasters in a year? They normally do 3 to 4 major rides between all the parks.Also last year they spent about 90-100 mill total so theres hope. CP is do for something halfway big right? Like Mantis,Raptor,Wicked Twister,and even Magnum cost 8-15 mill,Maggie being the cheapest. But that was also 1989 but still. They can build something quite nice. Lets hope! But im happy with what we got too!
^ I would say a little higher maybee 8-14 million. Prowler is 3'100 feet of track with 2 Millienium Flyer trains for 8 million. I could see them getting a GCI or a Gravity Group woodie. 3800 feet of track and maybee 3 trains. Does GCI do 3 trains?
^^B&M's now cost at least 15 million. Hydra: The Revenge at Dorney Park cost 13 million in 2005. Arrow was very inexpensive and got alot of bang for your buck. Intimans ar very overpriced. Alot of times they have problems. Farenheight, Stormrunner, Kingdaka, Top thrill Dragster,& Millenium have all had problems this year. I could see them maybee putting in a woodie.
Pepsi Refresh is saving one coaster at a time: http://pep.si/bTTsfc
^^ That sorta stinnks because the capacity wouldn't be that good. Thanks for telling me!
Pepsi Refresh is saving one coaster at a time: http://pep.si/bTTsfc
^ Hey lets say the green side is broken down, not a big capacity machine now. It isn't even close to gemini's capacity. Lightning Racer is a really good ride though! The only way to have more than two trains are having MCBR's or having a long brake run/and or seperate entrance and exit.
Pepsi Refresh is saving one coaster at a time: http://pep.si/bTTsfc
^Except GCIs (especially those with MFlyers) rarely break down. In fact, I cant think of a time Ive been at a park and seen a GCI break down. Of course excepting the 200ft tall Murphy's Law ride in Cincinatti I really cant think of a day Ive seen a wood coaster go down for anything other then a minor loose bolt issue (on the train) or weather but there you are.
I believe MrScott will be right once again, and it will involve water, and plenty of it at that. Who knows, it could be a decent substitute for a former water ride.
*This post dedicated to a former member and Cedar Point fan, and mayor of Lighthouse Point*
Blue Streak crew 2007
ATL Matterhorn Tri. 2008
Three things you need to fix anything in the universe: duct tape, WD-40, and a hammer. Duct tape if it moves and it shouldn't, WD-40 if it doesn't move and should, and the hammer as the last resort.
Touchdown said:
^Except GCIs (especially those with MFlyers) rarely break down. In fact, I cant think of a time Ive been at a park and seen a GCI break down. Of course excepting the 200ft tall Murphy's Law ride in Cincinatti I really cant think of a day Ive seen a wood coaster go down for anything other then a minor loose bolt issue (on the train) or weather but there you are.
Woodies can go down for computer issues (brake faults, proxy censors being out of whack, etc.) but for the most part, it's like you said and usually structural or weather reasons they go down.
Touchdown said:
^Except GCIs (especially those with MFlyers) rarely break down. In fact, I cant think of a time Ive been at a park and seen a GCI break down. Of course excepting the 200ft tall Murphy's Law ride in Cincinatti I really cant think of a day Ive seen a wood coaster go down for anything other then a minor loose bolt issue (on the train) or weather but there you are.
Lightning Racer (red side)was down when I went last year.It was having a computer issue with the restraints. I would say they are pretty good about not having down time compared to Intamin A.G. But anything is better than Intamin.
Pepsi Refresh is saving one coaster at a time: http://pep.si/bTTsfc
Actually I think they only spent 60 million last year between all the parks. The giga at KD will cost at least 30 million, plus Carowinds is rumored to be getting a Hypercoaster that will probly be close to 20 mil. The only hope is Kenzel said next year should be close to the 90-100 they were spending, so there is a chance they can get a coaster or a major attracion in if they up the spending. If not that only leaves 10-20 mil for the rest of the chain.
^ Are you sure its a hyper? You might be right but look at this video on http://newsplusnotes.blogspot.com/ . It said it was going to be "record beaking" and "history making" It might be a hyper though. :)
Pepsi Refresh is saving one coaster at a time: http://pep.si/bTTsfc
Closed topic.