http://www.facebook.com/photo.php?fbid=10151106837496463&set=a.1015...=1&theater
So with vertical construction starting already, do you think they are ahead, behind, or on schedule?
I think that they have a whole winter to get it done.
Favorite Wood: 1. Balder (Liseberg), 2. Boulder Dash (Lake Compounce), 3. Voyage (Holiday World), 4. Phoenix (Knoebels) 5. The Beast (Kings Island)
FavoriteSteel:1.Expedition GeForce (Holiday Park) 2. Rita (Alton Towers) 3.Magnum XL-200 (CP) 4. Nemisis (Alton Towers) 5. X (SFMM)
It's not Intamin. it will be done on time.
Favorite Wood: 1. Balder (Liseberg), 2. Boulder Dash (Lake Compounce), 3. Voyage (Holiday World), 4. Phoenix (Knoebels) 5. The Beast (Kings Island)
FavoriteSteel:1.Expedition GeForce (Holiday Park) 2. Rita (Alton Towers) 3.Magnum XL-200 (CP) 4. Nemisis (Alton Towers) 5. X (SFMM)
I bet the ride itself will be up by the end of the year. Maybe a week or two into January.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
I'm sure trackwork will be completed by then. Everything else that goes into it won't be.
Favorite Wood: 1. Balder (Liseberg), 2. Boulder Dash (Lake Compounce), 3. Voyage (Holiday World), 4. Phoenix (Knoebels) 5. The Beast (Kings Island)
FavoriteSteel:1.Expedition GeForce (Holiday Park) 2. Rita (Alton Towers) 3.Magnum XL-200 (CP) 4. Nemisis (Alton Towers) 5. X (SFMM)
No, they said steel would arrive in mid-October and vertical construction would begin in early November. The steel wasn't arriving in mid-October. I doubt that affected them though.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
God, I hope we don't have a March like that again this year. Apple and Cherry production took a big hit this year.
Favorite Wood: 1. Balder (Liseberg), 2. Boulder Dash (Lake Compounce), 3. Voyage (Holiday World), 4. Phoenix (Knoebels) 5. The Beast (Kings Island)
FavoriteSteel:1.Expedition GeForce (Holiday Park) 2. Rita (Alton Towers) 3.Magnum XL-200 (CP) 4. Nemisis (Alton Towers) 5. X (SFMM)
Don't get me wrong it was some great weather, but if you have anything to do with Agriculture in Michigan as I do, we all feared the frost that happened in April.
Favorite Wood: 1. Balder (Liseberg), 2. Boulder Dash (Lake Compounce), 3. Voyage (Holiday World), 4. Phoenix (Knoebels) 5. The Beast (Kings Island)
FavoriteSteel:1.Expedition GeForce (Holiday Park) 2. Rita (Alton Towers) 3.Magnum XL-200 (CP) 4. Nemisis (Alton Towers) 5. X (SFMM)
As topthrilldragster4lyf said:
"DT will be completely gone in two weeks.
SS will stay open through labor day. It will come down in September.
Footers will go in as soon as September.
Track sections and supports will arrive in October.
Vertical construction / steel erection will begin in November.
Station construction will begin in December."
Seems were on track.
*quote function wasn't working*
"I bet the ride itself will be up by the end of the year. Maybe a week or two into January"
-jeff
I was just thinking along the same lines as well. I think (just what i think) that It'll be all up before the end of the year, and the the winter season will be used to work on the entrance, station and area around gatekeeper.
I'm mostly talking out of my ass. I mean, I can't predict the weather. These rides tend to go up awfully fast, though. Presumably the electrical component of the ride is not time consuming like, say, Maverick, so there would be less pressure for that. I would think you'd want the steel erection done post-haste, so you can build the keyholes and not interfere with the front gate area.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
You must be logged in to post