Valravn Goes Vertical--Construction Starts

Gplez90's avatar

I know. It would be pretty cool though.

GL2CP's avatar

Once the track is installed what am I going to watch obsessively?


First ride; Magnum 1994

TTD 120mph's avatar

http://www.watching-grass-grow.com/


-Adam G- The OG Dragster nut

davidw's avatar

Five pieces of track installed.
Link to gallery | Animated gif


Valravn timelapse: Videos | Playlist | Cedar Fair Roller Coaster Construction on Facebook

No trees were harmed in the sending of this message, but a large number of electrons were terribly inconvenienced.

Getting ever so closer...I wouldn't be surprised if they finished it by the end of this week.

EDIT: Tony says there are only four pieces left. I'm counting two more on the site, waiting to be lifted.

Last edited by Perpetual Obsession,

Tony will probably say something on twitter regarding the last piece. They did it for the lift hill, why not the final piece?

Thabto's avatar

There will probably be a Periscope when the last piece is going in.


Brian
Valravn Rides: 24| Steel Vengeance Rides: 27| Dragster Rollbacks: 1

This has been so fun to watch! They're so close now!

Unless Tony moves the camera, I'm guessing we will be able to watch the clearance check and test runs in the next few weeks.

Test runs should be starting around the first week of April. Clearance pull through should begin in about 3 weeks.

CP Maverick said:

Unless Tony moves the camera, I'm guessing we will be able to watch the clearance check and test runs in the next few weeks.

I think it's a safe bet that the camera will be moved away for a few days surrounding the first test run, as was done with both Gatekeeper and Rougarou.

davidw's avatar

Five pieces of track installed.
Link to gallery | Animated gif


Valravn timelapse: Videos | Playlist | Cedar Fair Roller Coaster Construction on Facebook

No trees were harmed in the sending of this message, but a large number of electrons were terribly inconvenienced.

Do B&Ms do pull-throughs? I know Intamins do (because Intamin) but I don't recall ever seeing pictures of a B&M having it done.

I'm pretty sure all rollercoasters have to do them so that they ensure nothing will impact the trains or riders.

Too bad there isn't another tour coming up. I know! We could call it the Spring Fling!

CoasterCam's avatar

They don't do pull throughs with a train but they have to check all the low clearance areas with a gauge made by B&M. They did it with Banshee, TBird and Fury. I'd say they will do the same with Valravn. I can't post pictures on my phone but I'm sure you could Google it to fine one.


2018- Raptor

CP Top 5- 1)MF 2) Maverick 3) Gatekeeper 4) Top Thrill Dragster 5) Raptor

Chuck Wagon's avatar

This was for a Wing Coaster at Heide Park in Germany. (Photo is from this thread.)

Here is Millennium Force.


-- Chuck Wagon --
aka Pagoda Gift Shop

CoasterGuy15's avatar

They should definitely complete the track today, they only have one more piece!

Valravn is now a complete circuit!

Last edited by Jordan_Vanichek,

Weather Freak
Ride Warrior

GL2CP's avatar

Shes a beauty


First ride; Magnum 1994

You must be logged in to postArchived.

POP Forums app ©2024, POP World Media, LLC - Terms of Service