Valravn Goes Vertical--Construction Starts

Gplez90

Gplez90's avatar

I know. It would be pretty cool though.

+0

GL2CP

GL2CP's avatar

Once the track is installed what am I going to watch obsessively?


First ride; Magnum 1994

+3

TTD 120mph

TTD 120mph's avatar

http://www.watching-grass-grow.com/


-Adam G- The OG Dragster nut

+3

davidw

davidw's avatar

Five pieces of track installed.
Link to gallery | Animated gif


Valravn timelapse: Videos | Playlist | Cedar Fair Roller Coaster Construction on Facebook

No trees were harmed in the sending of this message, but a large number of electrons were terribly inconvenienced.

+2

Perpetual Obsession

Getting ever so closer...I wouldn't be surprised if they finished it by the end of this week.

EDIT: Tony says there are only four pieces left. I'm counting two more on the site, waiting to be lifted.

Last edited by Perpetual Obsession,
+1

audi0c0aster1

Tony will probably say something on twitter regarding the last piece. They did it for the lift hill, why not the final piece?

+1

Thabto

Thabto's avatar

There will probably be a Periscope when the last piece is going in.


Brian
Valravn Rides: 24| Steel Vengeance Rides: 27| Dragster Rollbacks: 1

+2

Nixie

This has been so fun to watch! They're so close now!

+1

CP Maverick

Unless Tony moves the camera, I'm guessing we will be able to watch the clearance check and test runs in the next few weeks.

+1

CoasterFreak94

Test runs should be starting around the first week of April. Clearance pull through should begin in about 3 weeks.

+1

samosuband

CP Maverick said:

Unless Tony moves the camera, I'm guessing we will be able to watch the clearance check and test runs in the next few weeks.

I think it's a safe bet that the camera will be moved away for a few days surrounding the first test run, as was done with both Gatekeeper and Rougarou.

+3

davidw

davidw's avatar

Five pieces of track installed.
Link to gallery | Animated gif


Valravn timelapse: Videos | Playlist | Cedar Fair Roller Coaster Construction on Facebook

No trees were harmed in the sending of this message, but a large number of electrons were terribly inconvenienced.

+1

CPVet

Do B&Ms do pull-throughs? I know Intamins do (because Intamin) but I don't recall ever seeing pictures of a B&M having it done.

+1

CoasterFreak94

I'm pretty sure all rollercoasters have to do them so that they ensure nothing will impact the trains or riders.

+1

Shawn Meyer

Too bad there isn't another tour coming up. I know! We could call it the Spring Fling!

+0

CoasterCam

CoasterCam's avatar

They don't do pull throughs with a train but they have to check all the low clearance areas with a gauge made by B&M. They did it with Banshee, TBird and Fury. I'd say they will do the same with Valravn. I can't post pictures on my phone but I'm sure you could Google it to fine one.


2018- Raptor

CP Top 5- 1)MF 2) Maverick 3) Gatekeeper 4) Top Thrill Dragster 5) Raptor

+1

Chuck Wagon

Chuck Wagon's avatar

This was for a Wing Coaster at Heide Park in Germany. (Photo is from this thread.)

Here is Millennium Force.


-- Chuck Wagon --
aka Pagoda Gift Shop

+2

CoasterGuy15

CoasterGuy15's avatar

They should definitely complete the track today, they only have one more piece!

+2

Jordan_Vanichek

Valravn is now a complete circuit!

Last edited by Jordan_Vanichek,

Weather Freak
Ride Warrior

+3

GL2CP

GL2CP's avatar

Shes a beauty


First ride; Magnum 1994

+2

You must be logged in to postArchived.

POP Forums app ©2025, POP World Media, LLC - Terms of Service