Well, I would have no problem agreeing with more track yet to be delivered. But, at this point I would say they are not trying to hide anything. The announcement is suposed to be made in the next few weeks. A month at most. My guess is that the announcement date will be based on the construction / delivery schedule. I would assume that they will announce it just before we would be able to figure it out ourselves.
*** Edited 7/25/2006 4:41:01 PM UTC by Jason Hammond***
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
They said the announcement would be made in August.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
And by the time your done doing that....it will have already been announced. ;)
"lost in the corners of both blue eyes"
http://www.myspace.com/apg
Thanks, DJ
Hmm, well I guess that must not be working now or something, because I have no luck with that when I type in any site, not just www.cedarpoint.com. *** Edited 7/25/2006 5:20:47 PM UTC by Jeff Young***
Jeff Young
I am 100% sure that we do not have all the track yet because there is no track yet to indicate how the train will be moving, as far as track for a chain lift, lim launch, hydraulic launch, cable lift. I almost wonder if these pieces wont show up After the announcement is made in order to keep it a secret.
Mechanical Engineer: Dont mess with us, we design your coasters.
You must be logged in to post