http://maverick.cedarpoint.com/_upload/gallery/mvt151.jpg
definitely no roof yet.
http://maverick.cedarpoint.com/_upload/gallery/mvt147.jpg
more queue area!
*** Edited 3/21/2007 8:44:19 PM UTC by maXaiRaptor***
I'm sorry to see that it seems one will not be able to get a very good view of the ride from the train.
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
It really surprises me they're using wood on the perimeter fence. All the other fences are that black wire fence like surrounding TTD. I like that fence too. But, I'm guessing to prevent people from being hit by objects either on Maverick or the train, the wood fence is required. It will make the train basically outside the park at that point though. Weird.
Awesome update. Everything is really coming together now. It looks to me like they tore out the old WWL queue and installed a new one. Without removing the trees I might add.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
The tunnel roof can be seen even better in this picture when the sun was reflecting off of it.
http://rollercoasterfreak.com/Cedar_Point/Tunnel_Roofing.jpg
*** Edited 3/21/2007 11:16:32 PM UTC by Jason Hammond***
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
I have to say that they made a lot of progress in just a week from the last update. Although I'm sort of upset that the canyon shown on the animations around the turn after the first airtime hill isn't showing up. Did they change their minds or is it still March and they still have time?
-Craig-
2008:Magnum XL-200 | Top Thrill Dragster
2007:Corkscrew | Magnum XL-200 | Maverick
One thing about this month, Walt or Jeff should just rename this topic to March construction update or something because the pictures this month are much better then February. They really are making a lot of progress. Although Jason, I don't feel like they touched that part of the queue. It looks the same to me. I'm axious to see what the concrete inside the WWL House looks like when they install the queue rails in there. The way they're going, testing will be going on full-curcuit. I know they are testing now, but wait until, later April.
The queue rails have most definitely been altered...
http://www.gallery.pointpixels.com/details.php?image_id=3692
http://www.gallery.pointpixels.com/details.php?image_id=3737
*** Edited 3/22/2007 2:11:57 AM UTC by DBCP***
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
No, but I know where you can find one...
Oh, and, If you haven't seen it yet...
http://www.cedarpoint.com/public/fun/blog/index.cfm?entry=4cd9da7e-454e-46f5-a8e0-94fd66678428
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
You must be logged in to post