Best location for a relocated Ripcord...

Pete

Saturday, December 17, 2016 5:57 AM
Pete's avatar

They actually could rebuild the area by installing permanent seating centered on the stage and incorporate the projection/sound room in the back of the seating area. I think it is not really a projection tower, but rather a control room for the lights and sound.


I'd rather be in my boat with a drink on the rocks,
than in the drink with a boat on the rocks.

+1

Shane Denmark

Saturday, December 17, 2016 2:00 PM

Thanks Pete! That was my point, since it was a blank slate when they built it. The control tower could've been above the bleachers (think PA booth at a high school football field).

Last edited by Shane Denmark, Saturday, December 17, 2016 7:44 PM

ROUNDABOUND.

+1

Mr. Potato

Saturday, December 17, 2016 5:57 PM
Mr. Potato's avatar

Keep in mind the bleachers weren't originally intended to be there at all. Wildcat was still there and ready to open for the season until about the week prior to opening day when they announced it was being removed. Then Wildcat was demoed in the days before opening day. This was kind of my point from my earlier post. The whole area felt put together at the last minute which resulted in poor design choices.


Gemini 100 (6/11/01)

+3

Go Intamin

Saturday, December 17, 2016 8:18 PM

It still confuses me as to why wildcat never opened that year.


CP Top 5: 1) Steel Vengeance 2) Maverick 3) Magnum 4) Raptor 5) Millennium

+2

Shawn Meyer

Sunday, December 18, 2016 8:25 PM

Somebody posted a week ago that they saw construction on Ripcord starting in the former area of Shoot the rapids. I was just wondering if you there were pictures posted about this somewhere or if someone has a past live cam shot in that area? I want to see it. :)

Last edited by Shawn Meyer, Sunday, December 18, 2016 8:26 PM
+2

Thabto

Sunday, December 18, 2016 8:32 PM
Thabto's avatar

You'll probably have to wait until Winter Chill Out.


Brian
Valravn Rides: 24| Steel Vengeance Rides: 27| Dragster Rollbacks: 1

+1

samosuband

Sunday, December 18, 2016 9:42 PM

I have a screenshot of construction on STR's site from a few weeks ago, but I'm not gonna post it for multiple reasons.


2015 - Ride Host: Shoot the Rapids 2016 - Team Leader: Ripcord/Challenge Golf 2017 - Supervisor: Thunder Canyon 2018 - Supervisor: Camp Snoopy 2019 - Supervisor: Power Tower

+3

Shawn Meyer

Wednesday, December 21, 2016 12:35 AM

That's cool dude. I wouldn't expect you to break the rules on here.

+0

Perpetual Obsession

Wednesday, December 21, 2016 12:58 AM

Well, maybe as the ride begins to rise in its new location, someone could snap a few pictures from across the bay?

+1

CPboy77

Wednesday, December 21, 2016 1:00 AM

I don't think it will really be a bad spot for the ride. It actually may be cool having it fly over the lagoon. It will look better than a rotting away ride that is for sure.

It could also be temporary until they build for the future in that location.

+2

Augustmueller

Wednesday, December 21, 2016 10:58 AM

^nailed it!

+1

Izzyamanda

Friday, December 23, 2016 6:47 PM

I was just there its over by where shoot the rapids was

+1

DSShives

Friday, December 23, 2016 11:05 PM
DSShives's avatar

If that's true, they got a whole lot of work done on that site in 3 weeks. When I walked by the former STR site on Dec 4th for the RWC event, there was concrete removal work going on. I dont see how they could have removed all that concrete, graded the site, pour footers and let them set, and installed the Ripcord tower in under 3 weeks.


Steve Shives
First Cedar Point Visit - 1972
Dockholder-Cedar Point Marina

+0

kylepark

Saturday, December 24, 2016 2:25 PM
kylepark's avatar

In three weeks, a lot of work can be done in the construction world. In just a regular 40 hour work week, with a good sized crew, you'd be amazed of what gets accomplished by contractors.

+1

Kevinj

Saturday, December 24, 2016 5:20 PM
Kevinj's avatar

Things can indeed move quickly.

https://www.theguardian.com/world/2016/nov/15/japan-fixes-vast-fuku...d-two-days


Promoter of fog.

+3

99er

Saturday, December 24, 2016 8:12 PM
99er's avatar

A Skycoaster can literally go up in two days once ground work is complete.

Last edited by 99er, Saturday, December 24, 2016 8:12 PM
+3

XS NightClub

Saturday, December 24, 2016 10:41 PM
XS NightClub's avatar

And the only positive to take away from that is it can come down even faster and all that's left is a flat level grade for the parks future use.

Last edited by XS NightClub, Saturday, December 24, 2016 10:41 PM

New for 2024- Wicked Twister Plus

+1

Go Intamin

Sunday, December 25, 2016 12:13 AM

Too bad road construction takes 5 years...


CP Top 5: 1) Steel Vengeance 2) Maverick 3) Magnum 4) Raptor 5) Millennium

+2

99er

Sunday, December 25, 2016 5:01 AM
99er's avatar

XS NightClub said:

And the only positive to take away from that is it can come down even faster and all that's left is a flat level grade for the parks future use.

You mean they aren't leaving it there forever with no chance of ever building a roller coaster!?!


+1

TwistedWicker77

Sunday, December 25, 2016 6:31 AM

Taking into consideration the size of the former StR spot with how much space a skycoasger takes up. I would like to think the plans weren't to place Ripcord right in the middle of the land. I'm sure it's going to be a "mixed attraction" area if I were to guess

+3