Lol then you both need to get your nose fixed
Tony Clark posted a picture today via Twitter of control booth not even hooked up yet I am no electrician but I am pretty sure that has to be up to code and be inspected before they even think about testing the actual ride let alone the controls on the control booth
On the same note if you refer to the on point blog back in 2013 gatekeepers trains got put on the track almost same exact time as Valravn. I think Valravn was a couple days earlier according to the blog and first test run wasn't til April 9th...I am not always right but I feel that is a good timeline to go by.
You mean they may actually be attempting theming? I think hell may have frozen over. But I think that may just be building materials on the top of the structure. I think it looks like it will be a viewing structure.
Brian
Valravn Rides: 24| Steel Vengeance Rides: 27| Dragster Rollbacks: 1