Roller Coaster Ride Operator's

99er's avatar

Your right, those dummies are expensive, $250. And it does take a while to unload them, because they are very heavy and awkward to remove. I think they range from 60 to 120 pounds. Don’t really remember. They should have an easier, faster way to remove them.


ForgottenEE I sent you a e-mail with a better watermarked photo..... FOR YOU TO USE!

Thank you. It looks very nice as my desktop. :)

Its been my desktop for months, it just got changed the other day

I have to brag, I know its the wrong place but ehh


http://www.dreamdorks.com/computer/my%20setup.jpg


You can see my awesome MS photo on my iBook.

ForgottenEE said:
Another Intamin ride in the park is a completely different story. They should just tear it down. It's a mechanical nightmare anyways.

Hmm, would that be Demon Drop? I've never been to Cedar Point, but at SFoT we had that EXACT SAME RIDE and its called Wildcatter... We used to get the newbies to test ride or a random supervisor if they were around cause it HURTS to ride that thing (we only had to ride 1 out of 6, not all 6!). And that one and the one in Cali ALL need to be torn down. When I was doing my interview back in Jan, we were actually joking about that too.

The only think I actually liked about that ride WAS the mechanical aspects of it. That and the fact that it would break down an average of 3 times a day and we'd always fight about who GETS to walk to the top. And it was the ONLY ride in the park w/ 2 lifts that both go 2 directions. Yeah for being a Mechanical Engineering Major and <3ing things like that! *** Edited 4/19/2006 4:45:40 AM UTC by zigg13pra***

You must be logged in to post

POP Forums app ©2024, POP World Media, LLC - Terms of Service