::struggles to put lid back on the can of worms::
Kinda wish I hadn't said anything now. If Jeff says it's a rubber band, then it's a rubber band. Don't start with the conspiracy theory crap.
Edit: Never mind, I found the answer over at Coaster Buzz. There is a 1-inch slack rule, at least for now. http://www.rollercoasterfreak.com/Cedar_Point/2007-02-23_Maverick_Tour/Data/page.htm?254,0
*** Edited 2/27/2007 10:01:55 PM UTC by Ralph Wiggum***
And then one day you find ten years have got behind you
No one told you when to run, you missed the starting gun
Lol, even though I took the picture, I didn't notice that pic before. I checked the full res and it is 1/2". The exact wording is as follows:
In order to ride Maverick
The shoulder harness must come down securly and the seatbelt must fasten properly with at least a 1/2" of black belt showing past the buckle in order to Ride.
You must be able to fasten your own seatbelt.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
Jeff, wasn't that the last train sitting on the outside of the P&D building facing Perimeter RD? It was close to the Mean Streak end of the building. For some stupid reason, I didn't get photo. I guess I thought having pics of the other 5 trains was enough. :)
I remember wondering about the 6th train as I walked out. But glanced back on the way to car and saw it. Or maybe I was imagining it.
I didn't see it anywhere. I would have taken pictures of it.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
I dunno, my cold ass wanted to get into anyplace warmer!
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
I wouldn't be suprised if they take advantage of this good weather and decide to work on Saturday.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
All I have to say is that is the rumored testing is suppose to be early....like around the end of March, they better haul arse! The tunnel still isn’t finished, the station is nowhere near done, the canyons and other stuff is still a decent ways away from being finished and Maverick opens up in 64 days. I sure hope that there's enough time for testing and troubleshooting for problems and everything. Perhaps I’m just being paranoid.....if so dont get mad at me, I have the off season blues.:)
-Adam G- The OG Dragster nut
You must be logged in to post