maXair is scheduled to be open May 10.
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
A part for the motor. Cedar Point isn't the only one havingproblemswith HUSS. Dollywood is currently in a heated contract issueover theirtopple tower. HUSS never has parts ready for back up andtakes foreverto send new ones to the parks. Atleast thats what I haveheard.
EDIT: I do not know why my computer has been doing this lately, butevery post I make it combines words. I always go back to edit the postand after I fix the problem it still gets rid of a space between words.Please just ignore it, it is not my doing.
Let's Get Weird.
Delirium was running fine yesterday and this morning.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
It seems maXair goes through this motor part issue almost every year. Wish I knew if this was the same part they were waiting on to be fabricated before the start of the '08 season. Last I knew of the Dollywood situation, they were pursuing litigation, or were about to head down that road, over their Topple Tower.
Blue Streak crew 2007
ATL Matterhorn Tri. 2008
Three things you need to fix anything in the universe: duct tape, WD-40, and a hammer. Duct tape if it moves and it shouldn't, WD-40 if it doesn't move and should, and the hammer as the last resort.
You must be logged in to post