According to Tony Clark during The Shore Line today they are still expecting TT2 to be open this weekend. They have been training ops crews on it as well. Zamperla and CP released the ride for State Inspection several weeks ago so things are looking good for the return of TT2.
Either way, I'm lucky enough to be there this weekend after a long winter so regardless of what is open, closed or broken down it is going to be a fun weekend.
Cedar Point website now updated and says Iron Dragon 42" height requirement.
-- Chuck Wagon --
aka Pagoda Gift Shop
JUnderhill:
All of the cabins are now installed on the Giant Wheel, I checked the webcams last night while I was at work and it didn't appear any had been installed yet although they were staged around the base of the wheel. Must have done it all this morning, quick work -
In an amazing display of speed and agility they were able to install all of the cabins at a quicker speed than it takes them to actually load guests into them for a ride-cycle during operation.
CoasterHawk:
I didn't know Cedar Point had a The Bat ride.
Well Mr Smart you do realize that the same manufacturer built both The Bat and Iron Dragon correct? Are you following so far? Also, the same company owns the parks that both rides reside in correct? Furthermore both rides are of the same type, I know this is complicated but are you still following me here? So, a ride built by the same manufacturer and of the same type owned by the same company had a height reduction this season. Based upon that wouldn’t you agree it was a safe assumption that Iron Dragon would end up with the same height requirement as The Bat?
Closed topic.