Not to change topic but Windseeker is being tested.
Take a Look
Lemon Chill Guy says 500 footer within the decade!
Train in the station?
Valravn timelapse: Videos | Playlist | Cedar Fair Roller Coaster Construction on Facebook
No trees were harmed in the sending of this message, but a large number of electrons were terribly inconvenienced.
The latest I see the first test run being is Thursday. I don't think we are getting one today due to the temperature, but Thursday it will defiantly be warm enough. There is defiantly a train in the station though.
Top 5 Coasters #1 Millennium Force #2 Intimidator (Carowinds) #3 Top Thrill Dragster #4 The Beast #5 X2
Coasters I want to ride: #1 El Toro #2 Leviathan #3 The Voyager #4 I305 #5 Behemoth
Has the low zone fencing even gone up? I doubt they'll test before that.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
I think that is exactly what they are doing. Making sure the trains are doing exactly what they need to while in the station such as restrain release.
Top 5 Coasters #1 Millennium Force #2 Intimidator (Carowinds) #3 Top Thrill Dragster #4 The Beast #5 X2
Coasters I want to ride: #1 El Toro #2 Leviathan #3 The Voyager #4 I305 #5 Behemoth
So, just so I'm clear, they're doing "restrain release" testing on the train that is "defiantly" in the station, and so long as the weather is warm enough, they can run full-circuit tests, regardless of whether or not the appropriate safety controls are in place?
I'm so glad the coaster construction experts are here to help. ;)
Brandon
How much would you pay to be able to take a ride on the first full circuit test? I can't even imagine how unsafe that would be, but lets just say if you could... Hmm I might realistically throw down $200 after signing a piece of paper not to sue if anything were to happen to me (no more than that though)... I would choose the left front outermost seat fo sho!!! hahaha