Windseeker construction cam up!

Looks like they moved the Pagoda Cam to right above where they are digging the foundation for Windseeker.


Bill Abele

JuggaLotus's avatar

Gregcoaster said:


You are either ignorant or a smarta$$.

There is NO footing for the electrical system you moron. You try to put words in other's mouths, so here is something for you to chew on, you do not know anything about common sense.


You should maybe take a closer look at the picture CP posted on facebook. It seems kinda odd to dig a hole the size and shape of the ride to bury the electrical lines into if you're going to build the ride next to it.

And looking at the Pagoda Cam (thanks Bill), it appears the foolish man has built his ride upon the sand.

Last edited by JuggaLotus,

Goodbye MrScott

John

djDaemon's avatar

Good catch, Bill! And just in the nick of time, too, given that the WindSeeker cam is all snowed up. :)

Gregcoaster said:
I simply stated that the footer for the tower is NOT the hole everyone is talking about.

Based on the new webcam shot Bill alerted us to, I'd say that the footer for the tower is indeed the hole we've been talking about.

JuggaLotus said:
It seems kinda odd to dig a hole the size and shape of the ride to bury the electrical lines into if you're going to build the ride next to it.

Why are you such an ignorant smarta$$?!? ;)

Last edited by djDaemon,

Brandon

Holy crap. With the new camera view I see what Jugga means about building on the sand. I would imagine that a mat foundation would be good enough for the outer portion of the ride but I can't imagine the tower portion just sitting on the sand. That center hole has to be deeper than the outer portion. Or did they drive piles for that?

bholcomb's avatar

Maybe it's for the control booth?

I'm thinkin' it's for the loose article bin...


4 summers of employment in ride operations does stuff to you.

That footer isn't deep enough for a loose article bin, especially if they're going to build it on sand.


"Thank the Phoenicians!"

I think it's for the kiosk for the timeshare people. Oh wait, it's already on the sand. It is the timeshare. ;)


My author website: mgrantroberts.com.

JuggaLotus's avatar

You didn't think Cedar Fair was actually going to install 6 of them did you? They'll just split the cost and share one.


Goodbye MrScott

John

Aha. That's why that hole is so shallow. The whole thing has to fit on wheels...


My author website: mgrantroberts.com.

When CP showed the original hole for the ride I was wondering about the depth and sand as well. I checked on the KI website to see what they had posted and found much more information concerning the footers. Looks like there are twelve that go 33 feet deep. This is why I miss Tony so much, and why does KI still have a blog?http://www.visitkingsisland.com/public/fun/blog/2011/1/5/WindSeeker...update.cfm


No coaster will ever be too fast or too tall!

JuggaLotus's avatar

Because their Tony didn't leave to pursue new and better opportunities.


Goodbye MrScott

John

Nice one Jugga......He really is doing well in his new position. That being said it would be nice if we could fill that void.


No coaster will ever be too fast or too tall!

crazy horse's avatar

It's the footer for the new lemon chill stand.


what you've just said is one of the most insanely idiotic things I have ever heard.
Everyone in this room is now dumber for having listened to it.
I award you no points, and may God have mercy on your soul.

Cement is being poored as of 9:15 am.

JuggaLotus's avatar

I see they brought the Putzmeister boom out again.


Goodbye MrScott

John

So the foundation is bigger, to support a tall tower on sand, what if the sand isn't strong enough and we get the Leaning Tower of Windseeker. Now I'm nervous again.

Using the example of a piece of wood and pencil on a table, don't fly with me, because a table, that the wood is on, is stronger that loose sand. But again, I don't know about this stuff.

Hope it don't tip over.


GATEKEEPER-I came, I rode, I was mildly disappointed; until a second ride (rear left) put GateKeeper back on the...it's a nice ride list.

I am a little nervous now, because on the COLD DAYS!!! Cement could Crack. I hope they know what they are doing now. A Snow Storm is coming in soon.

djDaemon's avatar

Given that it is once again Adena doing the construction, I'd assume they're quite well-versed in pouring (and properly curing) footers on the peninsula in the winter.

Last edited by djDaemon,

Brandon

KevinL332's avatar

It looks to me like its all under control, These guys know what there doing. Look at the cam. I see probably a dozen guys in and around the foundation zone and only 2-3 MAYBE working.. that says to me these are real construction workers. they have experience! I mean it takes a lot of practice to stand around and really make it look like your working!