I imagine there would be a heck of a lot of concrete needed for it's footer. Plus all the utility work/rework that will be done. Getting the concrete done before the ground freezes is always ideal. Once the concrete work is done, most everything else can be done in any weather. Obviously you don't want to be working 300' up in high winds though.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
Like someone said earlier, I think the camera will be pointed dead center at all the action once this thing starts to go up. On a side note, I think I just saw some queue rails go by on the back of a truck! Interesting stuff, if I do say so myself. :)
@cedarpoint You should nudge the Dragster Cam a little to the left so we can see #WindSeeker change the famous Cedar Point skyline. ;-)
@dougary we are looking at nudging the cam, problem is we need to find a really tall ladder :)
This wasn't me but I thought I would share!
It will be very cool to see a 300ft ride go up from the top or a 400ft ride lol
Halloweekends Screamster!
Fear Faire 2010-2011
Today they also removed the Cp ticket booth (AKA) Twister gate, I seriously hope they are replacing it in the area. When staying on point it is an advantage to use both gates on each end of the boardwalk, depending on which area of the park you want to enjoy.
1)Magnum 2) Blue streak 3) Millennium 4)Diamondback 5) Maverick 6)Dragster (Point lover since 66 age 8)
As I mentioned early on, I think the gate will be moved adjacent to the Coral Courtyard.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
Keep in mind that Ocean Motion also needs to have it's foundation dug and poured before it can go vertical again. I wouldn't doubt it if that is what is going on at the moment. I would also would not be surprised if the same contracting company are constructing both rides (I would put my money on Adena doing both). That would mean that when they have finished the excavation for OM they will move the equipment over to Windseeker.
R.I.P. Mr. Scott
I would suspect a 300' tall swing ride would require a deeper foundation, and therefore one requiring more time, to dig, pour, and cure out. This being the case, to me it only seems logical that the foundation for WS would come before OM. On the other hand, we may never know.
My author website: mgrantroberts.com.
You must be logged in to post