I highly doubt they're hiding anything. Based on the animation, the construction looks as though it will be centered pretty much directly between the tree and Oceana.
Not to mention that it doesn't look like a whole lot will be happening until after Christmas, at which time I imagine the tree will be gone.
Brandon
I am not sure if they still do it or not, but they used to fire up all the coaster lights for a flyover with special needs kids.
what you've just said is one of the most insanely idiotic things I have ever heard.
Everyone in this room is now dumber for having listened to it.
I award you no points, and may God have mercy on your soul.
The knott's version may be delayed for a while.
They are pondering if they want to remove the sky cabin ride to put windseeker there, or to build the ride elswhere in the park.
To this day, there is no sign of any construction at knott's. Kinzel is supposed to visit the park in the next week or so to make a final decision as to where it's going to be built.
what you've just said is one of the most insanely idiotic things I have ever heard.
Everyone in this room is now dumber for having listened to it.
I award you no points, and may God have mercy on your soul.
inversionsarebetter said:
So not much longer and we will see vertical progress
At the winter tour, Bryan Edwards said vertical construction would begin around March.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
This was only a few posts up.
Jason Hammond said:
At the winter tour, Bryan Edwards said vertical construction would begin around March.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
It could just be moisture frozen on the lens.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
You must be logged in to post