Windseeker construction cam up!

Kevinj's avatar

:)


Promoter of fog.

pointperson's avatar

Construction is really picking up today! The swing supports are going up now. It also looks like pavers have arrived.


Visual Scan!
First Top Thrill Dragster train of 2011!
Rollbacks: 1st Triple Rollback of 2009!

TTD 120mph's avatar

You can never have too many pavers. ;)

2 weeks to go, lets keep the momentum going!


-Adam G- The OG Dragster nut

I am very glad that Cedar Point also went the paver route, I was getting worried when I saw them pouring concrete in that area yesterday.

Also, it appears that they are putting the lights up on the gondola arms already. They are really flying through that gondola today!


R.I.P. Mr. Scott

Looks like Cedar Fair is going to miss yet another opening day ...
http://www.wcpo.com/dpp/news/region_north_cincinnati/mason/kings-is...has-delays

Wow, and to think it's not even an Intamin product.


windixie06

It's good to see the construction moving very quickly. I am surprised to see the swing supports up already. I didn't think they would get to that until sometime next week. Awesome! Seems like Cedar Point is moving along quickly with things. Now they just to need to put the roller coaster trains on the track because I still see some trains in the parking lot and Cedar Point has to test these roller coasters so each roller coaster can pass with the State of Ohio.

It looks like a bunch of the guys are getting to take in their work at KI tonight and enjoy the fruits of their labor by watching a light show of windseeker, and sadly wait for its inspection. Kudos to them for trying in this rough spring

Woah, looks like a whole new color pallet may be playing... I'm seeing green and purple for first time

Last edited by jo linn,

Wow that is impressive looking. Kudos to the design team on that, can't wait to see it spinning around.

got stills of all of it but I am sure the time lapse dude has it under control....

Send stills or post them please...I missed it again!!! UGH!

TTD 120mph's avatar

Erik Lee said:Wow, and to think it's not even an Intamin product.

Is that really fair to say? The ride's design/manufacturer has nothing to do with its delay. Like they said (and many here have said as well), the weather of these past 1 1/2 months have been TERRIBLE for building a 301 ft tower. There's only soo much you can do when the weather is poo poo.

I think KI has had it worse because they open when the weather usually starts to get better leading into May. So the time span they had to work with was filled with the high wind and heavy rainy days of the past month. Luckily for CP, the weather SEEMS to be getting better ::knock on wood::.

Last edited by TTD 120mph,

-Adam G- The OG Dragster nut

Yeah..Working in high winds, cold rain, and whatnot...I'm sure I wouldn't be flying through the project either xD...Oh well...It'll open when it opens..who cares..Deadlines are noticed here in our parks because of the off seasons, ect...But other parks that are open year round/ect this is never noticed & stuff...

im frankly surprised by the delay despite the weather. I would think a multi million dollar project plans on adverse conditions with contingency contracts for delays... you cant tell me there weren't days that project managers couldnt have been crackin a whip... perhaps delay and salavation are as good of advertising as none....? GEEKS?

You can only plan for so many construction delays, let alone almost an entire month of terrible weather. And its not like they are that far from testing. and there are plenty of examples of Multi million / billion dollar projects that have been delayed for weeks, months, and even years. Me personally I'm gonna put the blame on the weather.


08 -Thunder Canyon, 09 - Maverick, 10 - Mean Streak, 11 & 12 - Mean Streak ATL, 13 - Maverick TL

I know it's easier to blame the foul weather for another project not to be running on time. But, the Windseeker site sat vacant with absolutely nothing going on for a couple months earlier in the winter. And don't say they couldn't pour the concrete because it was too cold. Construstion crews do it all the time. And despite misconceptions tall buildings get built in crappy weather all the time. So, yes what I said was fair to say, especially after the Intamin fiasco's of previous years. I would have thought they would have been done and testing by now to be on the safe side.

Last edited by Erik Lee,

windixie06

Jason Hammond's avatar

Could we reserve the complaining for if and when a delay is announced? For all anyone here knows, It will still be open on time.


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

Well there are a ton of folks around KI windseeker this eve mostly look like they are standing around waiting for the show... I would assume those last 4 or so seats need to be hung before we see flight, but there are definatley a lot of looky lous there this eve.

Jason Hammond said:
Could we reserve the complaining for if and when a delay is announced? For all anyone here knows, It will still be open on time.

I thought that article stated clearly that officials said it would not be tested in time....

Jason Hammond's avatar

Which article? The one about KI? I'm talking about Cedar Point.


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

You must be logged in to post

POP Forums app ©2024, POP World Media, LLC - Terms of Service