Vertical Construction Has Begun!

In addition to that, did anyone look back at the rendering of the towers? Wouldn't you know, the towers are going exactly where they are in the rendering. AND the turnstiles are going underneath.

The old turnstile structure will likely be torn down at a later date. I still don't get the obsession with it.


TaER iT DoWN!11* TaEr iT aLL DoWn!

I think people can believe whatever they want. I am under the impression that the main gate is staying and the new keyholes will be incorporated into the entrance. Usually all demolition takes place before new construction. The rendering means nothing to me (go look at Maverick and Snake River Falls rendering)

There's really no point in arguing about it- but, until I see the Main Gate come down--- I will be of the belief that it's going nowhere. Do you not agree that it would be a whole lot easier to remove the main gate before brand new track, supports and footers are less than 20 feet away from what you are trying to remove? This is why they removed the ticket booths over a month ago.... why not do it all at once?

Maverick00's avatar

Why would they remove the turnstiles from the entrance still standing if it wasn't going to be removed?


Enjoy the rest of your day at America's Rockin' Roller Coast! Ride On!

TTD 120mph's avatar

^^The main point is that the entrance was not on the demolition list as of that moment. It seems the ticket booth removal fit into the construction schedule and would also give construction equipment a bit more ease to move around.

Plus, I don't see the reasoning behind the whole "once the steel goes up, they can't do anything to the entrance" idea. There's going to be a good sized area where smaller construction equipment (backhoes and excavators) can zoom in between the towers and take the building apart. It's not exactly impossible and is entire plausible with regards to a construction schedule.

There's still plenty of time to get the steel up and get the entrance out with plenty of room to do it. Would it have been easier to remove it first? For sure. But we don't exactly know how their construction schedule timeline is setup. But with multiple sources (the big one being Mr.Dangler) saying that the new structure will have the turnstiles under it. So it seems safe to assume that they know what they're doing and plan to work around the steel to get the entrance removed.

Last edited by TTD 120mph,

-Adam G- The OG Dragster nut

HersheyPark only has a very small entrance. I think there are only 4 ticket/pass scanners and one off to the side as an overflow. It works very well. I think the whole view of the Cedar Point will be amazing as you approach the front keyholes without the stucco turnstiles there. The current Entrance could still be there as a security issue...just my thought.

Last edited by Chuck_E_Cheese,

Sorry for the mess. Signature under construction.

All of the supports for the Camelback are up, and the Giant Flat Spin's first set of supports are up also.

Tilt-a-whirl, the main gate is coming down. The guest services buildings that are on the side of the main entrance ARE staying. The head of construction himself told me that. He also said that Gatekeeper track will be up over the keyholes hopefully by February 1st. The group sales and season pass center that is about twenty feet in front of the main entrance is getting renovated.

I also found out that Gatekeeper trains will be lit up, but they still do not know how they are going to set up lighting on the actual ride. The queue line for Gatekeeper is going to start in front of Gatekeeper to the far left by the station (which already has supports), and then it will go underneath the first turn out of the station, and when it gets here it will split into two lines. One line will be to sit on the left of the track, and one to the right. The layout of the queue line is what I just said, but the theme of it still hasn't been decided. There will be a regular fence on the far side of Gatekeeper that separates it from the beach, similar to the fence surrounding Wicked Twister.

Last edited by Bossmccann,
Your mom is to fat to ride TTD.'s avatar

I think some spotlights shining on the keyhole towers would be just fine for lighting. I don't think this coaster needs a pimped out LED package.


Let's Get Weird.

Like I said on another Forum:

I can tell you that most of the fixtures are LED. The track,pendent,recessed and globe lights are all LED. Other than that flourescent and halogen on the rest. The track lighting is going to be Bruck Lighting in a Matte Chrome and the Pendent light which is made by JESCO Lighitng is going to have a Cobalt Blue shade.


Ride-on

Question here. Does anyone know if the construction workers have the week off? I know today they wouldn't have been able to anyway with the snow that came through.

They had Sunday, Monday, and Tuesday off but they were supposed to work today. If they didn't work today it was because of weather

Maverick00's avatar

Well I checked the webcams at 1:45 and I couldn't see the main entrance and I could barely see the Dinosaur out front so I highly doubt they were working.


Enjoy the rest of your day at America's Rockin' Roller Coast! Ride On!

When I came home about a half hour ago, I noticed they are moving at a fast pace! It seems like they are trying to make up for Wednesday's weather mishap. All I can say is look for yourself. :)

TTD 120mph's avatar

I think they add in possible setbacks when they make certain construction schedules.


-Adam G- The OG Dragster nut

liebevision's avatar

Please tell me I'm not the only one having a hard time picking out exactly which supports have gone up on the webcam!

White supports plus white-grey sky plus white ground equals my eyes playing tricks on me.


Demon Drop 2004
Castaway Bay Lifeguard 04-05

Aaronosmer's avatar

From what I can tell this is as far as the supports go.

Last edited by Aaronosmer,

This view gives you a different angle that makes it a little more clear. From that view the supports don't look close to the Camelback but from the front gate camera they do

TTD 120mph's avatar

It'll be hard to see some of the smaller supports that are closer to the ground. As of right now, it looks like they only have the supports up to finish the bottom out from the camel back hill and start about 1/4 of the huge flatspin.


-Adam G- The OG Dragster nut

liebevision's avatar

yeah, you should have seen the cam this morning, literally the ground, sky, and supports were the same shade of white... ninja coaster


Demon Drop 2004
Castaway Bay Lifeguard 04-05

Ive been so focused on the camelback hill's completion til I happen to look at the actual front gate which seems to be one of the towers going vertical, can anybody else confirm ?

You must be logged in to post

POP Forums app ©2024, POP World Media, LLC - Terms of Service