Archives show that winds weren't too crazy in Sandusky. But, as we all know, that could have been an entirely different story on the peninsula. I suspect them assembling the first lift support at the end of the day was a result of waiting. But perhaps they were still adding stuff to the lift hill sections and couldn't get everything installed in time to erect any pieces.
It's all just guesses of course. Either they'll put stuff up tomorrow or they won't.
-Adam G- The OG Dragster nut
It looks like that lift section was erected today. I wouldn't have believed it but there is a pic from the webcam on this TPR Cedar Point forum page that seems to indicate that it is true.
I would post the pic here but I'm on mobile.
2018- Raptor
CP Top 5- 1)MF 2) Maverick 3) Gatekeeper 4) Top Thrill Dragster 5) Raptor
Here's a better picture that was posted very quietly to Instagram today:
https://www.instagram.com/p/-674fyJoAA/

They just finished putting up the next section of lift hill supports, and even without the lift hill track in place, this coaster is really starting to look massive! The size of the dive coaster track and supports become very evident when a worker is standing right next to it. Valravn is looking awesome!