Just Coasting said:
I wish Intamin was in charge of ORION, they would have a run through the terrain like Beast at some point through the ride.
But then you'd be the first to bitch when some last minute design or mechanical issue (or improper wheel installation) delayed the opening by a few weeks and then it had more downtime than uptime in its first year or two, because Intamin.
Just Coasting said:
I wish Intamin was in charge of ORION, they would have a run through the terrain like Beast at some point through the ride.
No, they would have whatever the park asked them to build.
I'd be shocked if Intamin ever built another Cedar Fair ride.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
Intamin builds whatever they are asked to build. Previous CP leadership was instrumental in persuading Intamin to design “the biggest, fastest”. Look what happened. They build it and then walk away when the problems arise. Blaming everyone else. But in the end, they get paid.
Blue people fly sideways when it rains
You must be logged in to post