Plus, who would want to work on theming in the freezing cold. Cement, or whatever their using, is kinda hard to dry in 30° temps. Theming will probably start once everything on the coaster end of the job is done.
-Larry T.
Michigan's Adventure - 2009 - Ride Host - Logger's Run, Sea Dragon, Dodgems
Geauga Lake 1888-2007
The theming can wait. I'm sure the goal is to get the ride operational , and do some testing before all the theming/landscaping is done.
If you look closely at the first photo, you'll notice that the framing for the tunnel looks to be complete. I'm sure it won't be closed in until all of the electrical work is finished and the ride has gone through some initial testing.
Anyway, thanks for the latest pics. It's always nice to get a peak at CP during the offseason.