Does anybody think that all the track will be inplace before the park closes for the end of the year?
It's possible. The park is saying December, but they seem to be making pretty good progress.
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
In my opinion no.
I don't think they will empty the pond until the park is closed.
*** Edited 9/18/2006 2:25:36 AM UTC by Jason Hammond***
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
Yeah, the pond is the only thing I questioned. If they've waited this long to drain it, they may very well wait until the end of the season. It would seem that they may need to bring the crain into the park itself to do some of that work.
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
I agree with DBCP. I am guessing they want the pond filled for Halloweekends just for the appearance, thus making it unlikely.
There are 2 types of computer users in the world; those that back up often, and those that have never had a hard drive fail.
I'm pretty sure it has been said that the steel erection would likely be done this month. Don't hold me to it, but I'm fairly certain that's the case. And even if it's not, they've got another month after that before the park closes.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
Actually Jeff, DBCP is right with the December date. They stated it on the FAQ section on Maverick's site.
http://maverick.cedarpoint.com/facts/faq/#faq_7
*** Edited 9/18/2006 4:22:00 AM UTC by Gomez***
-Craig-
2008:Magnum XL-200 | Top Thrill Dragster
2007:Corkscrew | Magnum XL-200 | Maverick
Does it really matter when the finish laying track?
As long as it's before May, I don't care when they finish.
It would not take long to drain the pond... its only a few feet deep (2-3 feet)
Cedar Point Lifer, RideOp, Now Park Guest
2008 - Mantis/MF/Skyride
2009 - ATL Raptor
2010 - TL Sweeps
2011 & 2012 - Area 3 Rides Supervisor
Well "steel erection" could also refer to the station. The ride is already 60% up with six weeks left in the season.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
I agree with Jeff, I think they might also be refering to installing the LSMs and liftwalks as well, which i'm sure they are going to take their time with.
Demon Drop 2004
Castaway Bay Lifeguard 04-05
Yeah, but when someone in construction says "steel erection," they normally are referring to the MAJOR components. I would guess the same is true with this, but I could be wrong.
I wouldn't even classify the stair on the lift in that category.
Anyway, moving on...
I think that the track will be at least 90% complete by the end of the season, with a start on the station structure. I would say track is done, station is moving along nicely, and LSM/magnetic brake installment started by the second week of November.
Blue Streak crew 2007
ATL Matterhorn Tri. 2008
Three things you need to fix anything in the universe: duct tape, WD-40, and a hammer. Duct tape if it moves and it shouldn't, WD-40 if it doesn't move and should, and the hammer as the last resort.
Check the latest pics on the mav page, the pond is drained and the supports for the turn have been erected. It looks to be a bit out of range from the webcam but they might have track on the pond turn by now.
No wonder... And Here I was thinking they were going to fall quite far behind this week... ;)
2007: Millennium Force, 2008: Millennium Force ATL, 2009: Top Thrill Dragster
www.pointpixels.com | www.parkpixels.com
You must be logged in to post