PyroKinesis09:
Walls being up this early certainly has me thinking this will be more than replacing the launch mechanism.
How is this any more an indicator than one for them tearing it down, or painting it purple?
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
Not sure you can blowtorch a mess of sensor wires & air lines.
I’m also still skeptical that you can tie together 20 year old steel track with new track.
While we’re at it, I’m equally as skeptical in the physics of dropping 400+ ft at 120 mph and banking into a helix / spike / loop / black hole that some folks are recommending here.
magdrag95:
I’m also still skeptical that you can tie together 20 year old steel track with new track.
I'm not sure how significant a difference there is between 10-year old Arrow track and 20-year old Intamin track, but there's always the Steel Phantom conversion for a point of reference re: drastically changing a ride's layout while keeping portions of the original track intact.
magdrag95:
I’m equally as skeptical in the physics of dropping 400+ ft at 120 mph and banking into a helix / spike / loop / black hole that some folks are recommending here.
Trim brakes 😉 sort of how you hit brakes immediately after Maverick’s tunnel. But to be honest, the best concept I’ve seen is the video a few pages back of the Ice Breaker type launch.