CP Irvine and I got to go up and play with the new pieces today.. Took pics and will have them up tomorrow..
Very interesting technology, the inside of the towers looks like a much smaller Power Tower with a few changes.
The parts that are here today are as follows.
Base of tower #1 (says T1 on it) - Base of T2
Second sections of T1 & T2. Each 60 feet in lenght. Larger end has a bolt pattern that matches the top of the base secion (base is about 10 feet of valves, tanks, pulley, and wiring then about 30 feet of tower.
Top of second sections have another bolt pattern for another part to be mounted.. but I noticed that the air chamber does NOT continue to the next section (yet to arrive) like it does from base to section #2.
Again.. pics will be up tomorrow..
-------------
MF 2000 - 269 laps
MF 2001 - 101 laps as of (7/12/01)
June 11th, 2001 - Gemini 100
*** This post was edited by Red Garter Rob on 7/12/2001. ***