Ride "Improvments"

^ Lol

I think they added the trims on Mantis to increase the ride time a few seconds, which somehow improves capacity. It seems stupid, but that's what I heard.

Gomez's avatar

The trains on Mantis were stacking everytime it arrived back to the station. Increasing the ride time gave the crew extra time to load a train. The trim isn't really used anymore since CP made a permanent solution of using only two trains instead of three. I'd rather be riding the ride a little slower than standing on the wait block to unload.


-Craig-
2008:Magnum XL-200 | Top Thrill Dragster
2007:Corkscrew | Magnum XL-200 | Maverick

You must be logged in to post

POP Forums app ©2024, POP World Media, LLC - Terms of Service