------------------
Walt Schmidt
Virtual Midway
------------------
Loyal Mean Streak fan 4ever:)
------------------
Everything that has a beginning has an end.
The Matrix Revolutions
I absolutely LOVE hearing the same 7 songs over and over and over and over and over and over and over and over again for six months straight.
------------------
2003 - Wicked Twister Crew
2004 - Wicked Twister Crew
It was always boring sometimes at Witches' Wheel cause it was always the exact same sounds every 2 minutes over and over. Music would have been nice.
------------------
- Chris -
------------------
June 11th, 2001 - Gemini 100
VertiGo Rides - 82
CP_bound said:
Well when I was a guest my friends and I even noticed that were heard Funky Town at least 4 times during the day, which was a bit much.
What do you mean CP_bound?! Funky Town IS Cedar Point to me! I heard it so many times every time I was there that it started to not be CP untill I heard Funky Town! And if I ever hear Funky Town outside of CP... I'm brought right back onto the midways in my mind. I just can't help it, I assoicate the song with CP so much now that I can't seperate the two!
------------------
Arms down.....Arms down.....Arms down.......Arms down.....Arms down....Arms down...(you think they would get it the first time?!)
2003-TTD-15 Rollbacks-1
2004- Demon Drop (first year)
Gemini said:
While it may get annoying for the employees, I think the music is a necessary part of the ride experience.------------------
Walt Schmidt
Virtual Midway
I agree. Working part-time at Sears Hardware, we get the same music over and over again, but it's enjoyable to our customers! ;)
------------------
YOUNGSTOWN 2010
------------------
Monster/W.W. Crew '04
Monster/W.W. Crew '03
Red Garter Rob said:
.. actually.. it was already in the works long before you brought it up... :)------------------
June 11th, 2001 - Gemini 100
VertiGo Rides - 82
What about the area between Coasters and sky ride where the midway music is out of phase... :)
------------------
Eddy the retard is awesome.
------------------
June 11th, 2001 - Gemini 100
VertiGo Rides - 82
*evil grin* *sinister laugh* *looks at Rob*
make it as loud as you're aloud . *evil laugh*
Sorry, I had to.
------------------
- Chris -
Red Garter Rob said:
It's not out of phase.. It's a delay issue due to the vast amount of open space. It's been looked into but cost wise, not really a priority.
Now Rob, lets be serious for one moment. What would be the cost of turning off the delays on the Laser show system during the day when they are played at the lower "BGM" level? The only cost there would be installing the delay from the Laser show tape to the park system so that during the show the sound would sync.
Just dreaming.
You know the answer to this.. :)
*edit* also consider this. We're not even running THROUGH the delay units right now and there's a time problem.. so HA!!!
------------------
June 11th, 2001 - Gemini 100
VertiGo Rides - 82
*** This post was edited by Red Garter Rob 3/19/2004 7:36:03 AM ***
------------------
Who was that masked man anyways?, I don't know but he sure had a stupid looking horse.
2000-2002: Camp Snoopy
2003: Mean Streak
2004: TBA
You must be logged in to post