It's still closed... we took that way last night thinking there would be a detour but no such luck. It is only closed for a very small section of the road and there are parked construction trucks on the road. I have no idea why else it would be closed, it doesn't look like any road work is going on.
Culvert Replacement. Only going to be closed 3 days. If you were going to follow the detour you would have had to take 250 out of Cedar Point and Sandusky since ODOT detours follow state routes. Scroll down to Erie County US 6.
CP&LE RR Supervisor/Engineer 04-18
[url][url]If the road is still closed, you can drive it like a local would.
Yeah, it's not a road designed for that kind of vehicle. Your best bet is to take the official detour.
The road is expected to remain closed through Friday, May 23. Here's the update from the Ohio DOT:
The closure of US Route 6 (Cleveland Road) west of Rye Beach Road will remain in place through Friday, May 23.
The road was originally expected to reopen today, May 21; however, unforeseen conditions beneath the road’s surface have required additional work to replace the culvert. The detour route will remain US 6 to State Route 2, west on SR 2 to US Route 250, west on US 250 to US 6, and reverse for eastbound motorists.
You must be logged in to post