Crain near Maverick

Jason Hammond's avatar

I caught this picture today from the webcam. It was in a few images, but it wasn't clear as to what was being done. It was only visible from about 8:15 to 8:30 so it may have been gone before anyone was even in the park. Was anyone there today?

http://rollercoasterfreak.com/Cedar_Point/pondcam_097357.jpg


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

Looks almost like it could be having something to do with Thunder Canyon.


Thrills Around the Corner!

PKIDelirium's avatar

Maybe they're putting the roll back in.


Might be putting new tubes in Thunder Canyon, or doing something else involving it.

I was at the park today and Maverick was down half the day due to break line problems.


Terror Island Screamster 08', 09', 10', 11'

Break line problems? The employees had a long line for the break area so they decided to shut Maverick down?

At work, I really hate it when I have to fix break lines. Going on lunch brake, though, is grate.


Water is involved
R.I.P: The Mayor, Mr. Scott

Jeff's avatar

I'm still trying to figure out who Crain is.


Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music

Josh M.'s avatar

Maybe he meant Krang... that guy always freaked me out...

Or perhaps it was this southern baptist preacher named Rick Crain... Maybe he was going to Chick-Fil-A

;)

Jason: I hope you know I'm just goofing around... Everyone makes spelling errors...

*** Edited 6/6/2007 2:34:16 PM UTC by Josh M.***


Ripcord Crew 2002 / MF Crew 2004

Jeff LOL very funny!! I thought the same thing when I first read the post.

Would Cedar Point really use a crane to move tubes on Thunder Canyon? I would think that there would be an easier way if they do.

I was up there and I was there right when the park opened and that crane was gone. Yeah Maverick was down for about 3 hrs right at the beginning but I stayed and waited because as soon as I got off Maverick broke down again.


Stephen P.
2008: Raptor
2009: Front Desk Clerk; Breakers Express
2010: Assistant Front Office Manager Breakers Express

TTD 120mph's avatar

So it was down for at least 5 hours?


-Adam G- The OG Dragster nut

Crain near Maverick? Is that a bad thing? Should the general public be frightened?


Owner, Gould Photography.

Jason Hammond's avatar

English / Grammer / Spelling were my worst subjects. Funny thing is, now I write specs and quotes as a part of my job. Thank goodness for spell check. :)


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

JuggaLotus's avatar

^ - guess your spell check doesn't have "grammar" in it. ;)


Goodbye MrScott

John

djDaemon's avatar

What about Fraser? ;)

ieSpell


Brandon

I would say Maverick was down for about 4 hrs total while I was there, but I left at 3:15 so I have no clue if Maverick broke down after that.


Stephen P.
2008: Raptor
2009: Front Desk Clerk; Breakers Express
2010: Assistant Front Office Manager Breakers Express

JuggaLotus's avatar

Wait a second? An Intamin coaster is having downtime issues early in its first season? WHOA! When did I miss this? I thought all Intamins were models of reliability. When did that change?


Goodbye MrScott

John

djDaemon's avatar

It's not really down, John. They're just pretending it is, as part of the massive conspiracy that has been alluded to. If it were to run perfect, then people might suspect that CP had secretly constructed this coaster at their off-site proving grounds (accessible only via matte-black helicopter), in order to test it. Because, as we all know, its impossible to construct, test and open a ride in only 20 months. ;)


Brandon

JuggaLotus's avatar

Sorry. My fault for not constructing all possible conspiracy scenarios before posting. I'll be more careful next time.


Goodbye MrScott

John

You must be logged in to post

POP Forums app ©2024, POP World Media, LLC - Terms of Service