Just showed up to ride and they have an official permanent looking sign that SV closed at 5 today, what gives :( so bummed!
Gonna need extra time to do more work, test and get it ready to run with multiple trains. This could be the night they figure it out once and for all.
First ride; Magnum 1994
The ride closing at 5 was announced all over social media so it shouldn't have come to a surprise. The are clearly continuing to work on getting multiple train operation going. Im guessing we see 2 train operation this week.
Steve Shives
First Cedar Point Visit - 1972
Dockholder-Cedar Point Marina
Unfortunately it was a surprise for me... wasn’t on social media all day bc I was at the park. I’m all for getting it fixed, was just bummed that’s all
If you don’t trust the word of the person that told you that, how is a random person on a forum going to confirm it for you?
New for 2024- Wicked Twister Plus
Hmmmm...i won't believe it will down Thursday til I see official word. Would be nice to truly know cause I am wanting to go Thursday.
Sacrificing playing video games to ride roller coasters.
Good point. I am going to believe him, and have rescheduled our trip for Friday. That means it will end up being open today, and the heavens will unleash fury with rain tomorrow on us all day and we won't get to ride it anyway!
That's my luck usually!
We have a 5 hour ride, and people that are making their only trip their this season, so we didn't want to risk it lol.
Guest relations worker was right, you guys made the smart choice passing today, considering I am seeing the sign at the gate say Steel Vengeance will not open today.
Sacrificing playing video games to ride roller coasters.
The person at the gate said Steel Vengeance will be down all day because they are trying to synchronize two trains. I got one ride on it yesterday.
Twitter is full of people who ARE NEVER COMING BACK AGAIN!!11!!
-Craig
Lifetime Laps on Woodstock Express: 0
I'm in line for Maverick which still has not opened. I can confirm Steel Vengeance is testing with two trains. I saw one rolling into the station with another on the lift.
operative_me said:
Twitter is full of people who ARE NEVER COMING BACK AGAIN!!11!!
Good! That's fewer people in the line.
operative_me said:
Twitter is full of people who ARE NEVER COMING BACK AGAIN!!11!!
Hope they get made whole.
I rode Maverick 3 times in a row and then waited for the railroad and Steel Vengeance was testing 2 trains the entire time. Then Valraven went down when I reached the platform. Then Top Thrill Dragster went down when I was 3 away from the front seat. I need to go to Guest Services to be made whole, but I'm sure they'll close right as I get there.
Edit: testing 2 not 3 trains.
Front Seat Rider said:
I rode Maverick 3 times in a row and then waited for the railroad and Steel Vengeance was testing 3 trains the entire time. Then Valraven went down when I reached the platform. Then Top Thrill Dragster went down when I was 3 away from the front seat. I need to go to Guest Services to be made whole, but I'm sure they'll close right as I get there.
Testing 2 or 3 trains? Thought there was one that needed parts as they were using that to supply to the other trains?
Would be sweet if they did get all 3 running tho!