I have been reading this site for about a year and want to commend Jeff for this outstanding site!!
With regard to the Crystal Beach Cyclone, here is why CP would not build anything that was close to that ride:
1. They could only run 1 train at a time due to no place to put block brakes and a short brake run. And the trains were only 20 passenger capacity. I doubt they could be any longer due to the different forces in the front and back due to the longer train.
2. Many people were seriously injured on this ride. Broken collar bones and broken arms were not just myth, they happened due to the incredibly violent changes in direction.
3. 3 Traver Cyclones were built. Those at Palisades and Revere Beach didn't last 10 years due to lack of ridership. The only reason Crystal Beach's made it till the 40's was being a smaller park, they could not afford to do anything drastic for a while.
4. Maintenance was a nightmare, not only the track, but the structure as well. There are documented instances of welded rivets flying off the structure due to the extreme forces in the curves.
5. The pacing of the overall ride was poor. It would be extremely fast in parts, and very slow in others. To the point that winches had to be installed to help out stalled trains.
In short, these rides were engineering failures. If CP wanted that, they could build Son Of Beast. If anyone would like to read further on this, there is an excellent article in Coaster World (pre-Roller Coaster magazine)issue IV, Volume 3 (Fall 1983) by Joe Heflin that outlines the failure of the Traver Cyclones.
(sorry so long)
Idora Wildcat
*** This post was edited by Idora Wildcat on 1/3/2001. ***