Work going on behind the fence!

dcpoint

Check out the webcams now. About 15 minutes ago trucks started heading in - no deliveries of parts or track but people walking around the inside area now.

+1

topthrilldragster4lyf

There's also a contractor trailer back there.

+1

djDaemon

djDaemon's avatar

Interesting. I wonder if they're going to install a new ride or something?


Brandon

+24

dcpoint

Getting ready to harvest the pumpkins is my guess...

+11

MaverickForce

Webcam 3 is pointed at Magnum. I expect it to be removed this season and my inside sources says so.

+2

Jason Hammond

Jason Hammond's avatar

Magnum or the camera? :-)


884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube

+6

CPNostalgia

CPNostalgia's avatar

It must have sank too far. Maybe they'll relocate it to Michigans adventure.


Burritos, Inspiration Point, Fork Balloon Sports, Cards in the Spokes, Automatic Biographies, Kites, Kung Fu, Trophies, Banana Peels We've Slipped On and Egg Shells We've Tippy Toed Over

+2

CP Maverick

They moved all three cameras within an hour of parking the first trailer back there. Must be some super secret work going on.

+1

Final Force 500

Final Force 500's avatar

djDaemon said:
Interesting. I wonder if they're going to install a new ride or something?


I think we will see brown track going in and after each one is placed, a red "-$45" will float into the sky.

+42

CoasterCam

CoasterCam's avatar

^^^That just made my day (:


2018- Raptor

CP Top 5- 1)MF 2) Maverick 3) Gatekeeper 4) Top Thrill Dragster 5) Raptor

+0

CPNostalgia

CPNostalgia's avatar

45$ is pretty cheap for coaster track


Burritos, Inspiration Point, Fork Balloon Sports, Cards in the Spokes, Automatic Biographies, Kites, Kung Fu, Trophies, Banana Peels We've Slipped On and Egg Shells We've Tippy Toed Over

+1

TTD 120mph

TTD 120mph's avatar

It goes quick when your budget is $23,000.


-Adam G- The OG Dragster nut

+14

Final Force 500

Final Force 500's avatar

Actually, I think the steep dive coaster lift is $55 come to think of it.

+7

Renegade

CPNostalgia said:

It must have sank too far. Maybe they'll relocate it to Michigans adventure.

Well, it was made in the same year they got their last coaster...

+3

Kevinj

Kevinj's avatar

Final Force, your 36-like post is to be commended, but you really need to know how to make an exit.

Last edited by Kevinj,

Promoter of fog.

+9

CoasterHero

CoasterHero's avatar

Final Force 500 said:

djDaemon said:
Interesting. I wonder if they're going to install a new ride or something?

I think we will see brown track going in and after each one is placed, a red "-$45" will float into the sky.

Roller Coaster 1 looks too intense for me!

+2

45Wheelgun

God I love this place.


Cedar Point guest since 1974

+1

Thabto

Thabto's avatar

I think Final Force 500 wins the internet. 32 upvotes! I think that's a record here.


Brian
Valravn Rides: 24| Steel Vengeance Rides: 27| Dragster Rollbacks: 1

+2

Final Force 500

Final Force 500's avatar

Of course the immelmann will consist of a large half loop, a tiny half corkscrew, and several drop sections.

Last edited by Final Force 500,
+1

PyroKinesis09

PyroKinesis09's avatar

Now this is turning into your "jerkstore" moment.

+1

You must be logged in to postArchived.

POP Forums app ©2025, POP World Media, LLC - Terms of Service