Vertical Construction has Begun!

It looks like vertical construction has started on the spiral towards DT.  It seems that they are putting some of the support structure in place.
yeah, it looks like supports for horizontal track.  WOOHOO!

-----------------
Mr. Skyward is my hero.
Just because I have a fast car, doesn't mean pull me over on my way to CP!
BHG:"If I don't believe in myself would that be blasphemy?"

Haha! Wow...

I decided to check out the webcam this morning and was happy to see that vertical construction has indeed begun. Somehow I knew if I came over to GTTP someone would have already posted about it though.

How did I know? :o)


-------------
James Draeger
"Legend is a wooden Jesus"

This really shows how ahead of schedule they are! In Monty's latest entry, he says, "Actual steel erection should begin in late December..." Unless December 12th is considered "late" December, they are really ahead of schedule! He also says, "... and once that starts it'll be about two months until the ride is finished." So, Wicked Twister should be finished in mid to late February. They really got lucky with the weather!

-----------------
Force Laps: 424
Wicked Twists: ???
6/11/01: Gemini 100

I don't think it will be ready by February... I tihnk it will be ready before February.  I just watched them put up two support things for the back spike, and if they continue like that, they'll be done by January! I don't know... never watched an impulse be built before, guess you have to wait to install the LIMs and stuff.
-----------------
"I'm Bored..."

*** This post was edited by Wí¢këÐ Twî§të® on 12/13/2001. ***

They have put a lot up in just one day.  Check out the webcam before it gets dark.

-----------------
"Your obssesed w/ that place aren't you?"

What are you talking about being done before December?  Its December right now chief...

Anyone have a link to the webcam from when it was lighter out?
-----------------
Kerry, who thinks Boardwalk Fries are the next best thing besides coasters at Cedar Point.

*** This post was edited by force312 on 12/12/2001. ***

I have one saved, If you e-mail me, I'll send you the picture.

I think by February the ride will be finshed. But, who knows how long it will take to get the LIMs and the computer working correctly. From what I hear, It takes a while!

-----------------
Force Laps: 424
Wicked Twists: ???
6/11/01: Gemini 100

Pete's avatar
The steel work is just a part of the construction. Don't forget, they need to put in all the power and control systems, something that they will probably do after all the steel is in place.
-----------------
It's very hard to drink all day...
Unless you start first thing in the morning.
Unless they're seeing how the track aligns with the supports, I think they might start putting the track on the finished portion of the station supports. :)
-----------------
i'd say your right.they are pittin up some track
It didn't see them do anything today, did they?
-----------------
"I'm Bored:(..."
Jeff's avatar
Has there been a diary update lately? I could see them getting ahead of themselves if the steel hasn't been delivered. SUE went up in no time. With this warm weather, they've gotta be loving this. Test rides in February? Wouldn't that be interesting to see!

-----------------
Jeff
Webmaster/GTTP
"As far as I can tell it doesn't matter who you are. If you can believe, there's something worth fighting for..." - Garbage, "Parade"

When I checked the webcam the other day I was hoping to find the diary updated. But, sadly not. Even after yesterday with the track out there. I hope to see an update in both construction photos and diary in the next few days!

-----------------
Force Laps: 424
Wicked Twists: ???
6/11/01: Gemini 100

Track is on site and is now in the station going out one end..
-----------------
2002:Its gonna shock you!
Oh, wait, it already shocked me, its Tuesday..
rain sucks.  I can't see. :(
-----------------
Mr. Skyward is my hero.
Just because I have a fast car, doesn't mean pull me over on my way to CP!
BHG:"If I don't believe in myself would that be blasphemy?"

Well, this is a preview for those skeptics who believed that WT was built too close to the lake.  It is not.
-----------------

*** This post was edited by garik_law on 12/16/2001. ***

Too close to the beach?!  It is being build ON the beach! :)
-----------------
-Matt
2001 Magnum Crew
I don't know if anyone else noticed, but on the 13th it appeared they drug out 4 pieces of track.  One closest to the cam and 3 at the other end.  It also appeared as if they had wrapped two pieces in a tarp or something.  I was wondering if these are the LIMs and they need to be protected from the rain?  Once the station is built, they will be sheltered (so I assume).

Unwrapped Track, Wrapped Track

Thoughts? Insight? Wisdom?  I know that it is track and that it was wrapped since I have a loop of it :)  Yes, dork I am. 

got an unedited pic of that webcam? (the same pic w/o the notes)