I was wondering, is there a possible way to estimate the current length of track from a pic of the whole staging area (by counting the pieces and knowing their rough length). I mean, could we possibly conclude if/[the amount of] more ground work and footers are needed and that the track will be going other places besides the current dirt plot? I know itd be hard since we dont know things such as its height, but if we found that it already is very long with only the current pieces of track at the staging area, we may get an idea. Either way, itd be nice to know how long it is from the track we can see.
Looks interesting, but at this point I won't be too excited until vertical construction begins. I'm fairly confident that it will have started by the time I get back to Cleveland in late August, and perhaps by the time I'm there for a week in late July. The only thing I found very interesting are the big footers in the middle of the site, which I think are the ones Jeff referred to as having the largest base. I'd expect that will be the tallest point on the ride, yet the footers go in a curved shape. The only sense I can make out of that is that this will be a launched coaster and the first hill will have a slight curve to it. What do you guys think?
This question just came to mind, and maybe someone can answer it...
since I can't recall back to TTD, once vertical construction does start, or has been finished, then is there a particular order in which track is constructed? I wasn't sure if maybe they start from the station and work out, or what...
Owner, Gould Photography.
TTD 120mph said:
How any pieces are currently on site?Im going to make a really wild guess and say that we either have over 1000 feet of track or just under that.......just a guess.
When I was there on the 2nd, there were 24 pieces of track. So If anyone knows how long a typical piece of intamin track is...
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
mk522 said:
This question just came to mind, and maybe someone can answer it...since I can't recall back to TTD, once vertical construction does start, or has been finished, then is there a particular order in which track is constructed? I wasn't sure if maybe they start from the station and work out, or what...
This picture here shows the first pieces of track that were installed on TTD.
2005 - Dragster Photo
2002-2007 - Season Pass
From what I saw Thursday, I'd say we're closer to 40 pieces now.