They just put the last piece of track on!
2013: Maverick
2014: Ride Supervisor - Cedar Downs & Cadillac Cars
Ugh, Gab, you beat me by 4 minutes. We have a complete circuit coaster! What can we obsess over now regarding GK construction?
Sledge4cp said:
Ugh, Gab, you beat me by 4 minutes. We have a complete circuit coaster! What can we obsess over now regarding GK construction?
Let me see, the brand of PLC controller,
the method of charging the ride lights,
the manufacturer of the chain lift oil,
the size of the storage bins,
the mass & volume of the cars
the coefficient of friction between the cars and the track.
Any other suggestions?
2013: Maverick
2014: Ride Supervisor - Cedar Downs & Cadillac Cars
^how about not haha. So what's the next step? Adding all of the electrical wires and sensors?
Top 5 Coasters #1 Millennium Force #2 Intimidator (Carowinds) #3 Top Thrill Dragster #4 The Beast #5 X2
Coasters I want to ride: #1 El Toro #2 Leviathan #3 The Voyager #4 I305 #5 Behemoth
Electrical has been well under way for some time now. Still a ways to go though. Next up is the pull through!
-Adam G- The OG Dragster nut
I'm sure I've said this before, but I'll say it again. B&M coasters do not do pull throughs. The areas that are tight are checked with this:
http://rcdb.com/4190.htm?p=22875
They can easily remove the frame from the track, so they don't need to pull it through the whole track to check all the tight spots.
I was thinking that the lighting on the trains are pretty simple. I know that all cars already have a internal electrical system, if it's by battery, or a electrified element in the track.
The lights are not going to require too much power since most LED's these days are super low drain. I think it would be nothing but plugging the cars in at night, and give them a 5-6 hour charge.
I wonder how long the queue will be? I know it's a sort of random question, but just one I want to know. I can't wait to ride!
Anyone know if the chain has been installed to the lift hill yet?
Top 5 Coasters #1 Millennium Force #2 Intimidator (Carowinds) #3 Top Thrill Dragster #4 The Beast #5 X2
Coasters I want to ride: #1 El Toro #2 Leviathan #3 The Voyager #4 I305 #5 Behemoth
I would assume that next they install the PLC (brain of the ride) if they haven't done so already, as well as finishing up the station and beginning the queue area.
2013: Maverick
2014: Ride Supervisor - Cedar Downs & Cadillac Cars
There is plenty to watch the webcam for. When March rolls around, we will be able to see them take shape on the new entrance. What I mean is they'll start to assemble the ticket booths and the roof. Plus right now, we are watching them assemble the Station roof. :)
You must be logged in to post