------------------
Current Coaster Count: 89
Time will tell.
Maybe the launch section will consist of mostly white track. As the train gets near the end of the launch it will first cross one piece of red track, then maybe three pieces of white track, another red piece, then two pieces of white track, then one more piece of white before going to solid red. That way it's like the red section "builds up" as the train nears, and pulls up into, the tophat.
Kinda fits with the whole drag racing / redline theory I suppose.
------------------
James Draeger
-Captain Sarcasm
Whatever there gonna do there's gonna be some kinda alternating between the colors. In the parking lot theres both a red and a white piece of track that is part of the launch section.
------------------
1. Kumba 2. Millie 3. Mantis 4. Lightning Racer 5. Wicked Twister (front seat)
"The key to a happy life is moderation" -- Jon Stewart
jdubya said:
I think they will alternate red and white sections on the launch run to give the impression of even more speed. Kind of like looking at the white stripes on the road or at the guardrail posts as they whiz by.
That was my theory from acn. YOU STOLE IT!
BAH!
jk
------------------
June 28th: LocoBazooka Tour (Sevendust headlining)
July 11th: Korn, Puddle of Mudd, and Deadsy
------------------
June 28th: LocoBazooka Tour (Sevendust headlining)
July 11th: Korn, Puddle of Mudd, and Deadsy
The launch track is on site. Virtual midway had plenty of pics of them. Plus some with the track for the launch sled partially installed.
It's fairly certain that the launch will alternate just like the pull out. You can see some of the launch sections sitting on the ground from the power tower cam. And they all seem to be alternated.
You must be logged in to post