They were still pouring the footers for the first hill of Millennium Force in October.
This ride has a 180 foot tower and it is only October 2nd!
I feel that this ride will be huge. Huge like we have never seen it before. Look at the radius of the bottom pullout on the first drop of Millennium Force and the pull outs and ups on Xcelerator. They are tiny when compared to what is at the Area 51 site.
This suspence is terrible. There are so many questions that have yet to be answered.
Why the early construction?
Will construction occur else where, on midways, after the park is closed for the season?
What is the height going to top out at?
Will there be inversions?
At times I really get mad at Cedarpoint for doing this, but it is fun.
-----------------------------------------------------------
"How many kids did your father have?"
"None , your mother had them all."
*** This post was edited by craps36 10/3/2002 7:42:35 PM ***
*** This post was edited by craps36 10/3/2002 7:44:13 PM ***
------------------
Michael McCormack CP '02: 44
Magnum XL 200: 427 (553)
Millennium Force: 11
Wicked Twister: 31
------------------
Jeff
Webmaster/GTTP
Jeff - Webmaster/Admin - CoasterBuzz.com
"There's nowhere to run, nowhere to hide, when it's all in your mind. You gotta let go." - Ghetto, Supreme Beings of Leisure
I'm out
Bussey
----------------------------------------------------------------------------------------
"Fixing the traffic problem by adding more lanes is like curing obesity by loosening your belt."
craps36 said:
Jeff, how do you explain this?... that when MF was being constructed only the footers were done around this time.
Uhhhh...maybe that's because there were far more footers to be poured for MF than this taller, but shorter-tracked project.
Seems to fit the profile perfectly.
BTW, CP was clearing earth for PT--which was far quicker to build than MF, the '03 project or even WT--in Mid-August if I recall correctly. So the contention that 'they started early, therefore it's two miles long' really doesn't hold water.
-'Playa
------------------
The CPlaya 100--6 days, 9 parks, 47 coasters, 2037 miles and a winner.....LoCoSuMo.
*** This post was edited by CoastaPlaya 10/7/2002 1:38:48 PM ***
------------------
James Draeger
-Captain Sarcasm
------------------
Jeff
Webmaster/GTTP
Jeff - Webmaster/Admin - CoasterBuzz.com
"There's nowhere to run, nowhere to hide, when it's all in your mind. You gotta let go." - Ghetto, Supreme Beings of Leisure
------------------
I'd rather die living than live like I'm dead
------------------
Without upstops, airtime would have a whole new meaning!
craps36 said:
Millennium force was topped off in the middle of december.They were still pouring the footers for the first hill of Millennium Force in October.
This ride has a 180 foot tower and it is only October 2nd!
I feel that this ride will be huge. Huge like we have never seen it before. Look at the radius of the bottom pullout on the first drop of Millennium Force and the pull outs and ups on Xcelerator. They are tiny when compared to what is at the Area 51 site.
This suspence is terrible. There are so many questions that have yet to be answered.
Why the early construction?
Will construction occur else where, on midways, after the park is closed for the season?
What is the height going to top out at?
Will there be inversions?
At times I really get mad at Cedarpoint for doing this, but it is fun.
-----------------------------------------------------------
"How many kids did your father have?"
"None , your mother had them all."
*** This post was edited by craps36 10/3/2002 7:42:35 PM ***
*** This post was edited by craps36 10/3/2002 7:44:13 PM ***
hey guess what my dad is a super for janotta and werner...look in the pictures for the company installing the coaster...wish i could share the plans but we arent allowed..but i think youll all be happy and look for the "announcement" in the next 30 to 45 days with sketches
Closed topic.