I was at the point yesterday, and we stopped at Steak & Shake on the way out. While we were leaving I caught the headline of the Sandusky Register that said, "New Ride at Cedar Point." I got the paper and it's pretty interesting. I tried to look for it on the website, but I couldnt' find it. It says:
"The floor plan sketch shows a station design with a control room, a queuing area, loading and unloading areas, tracks traveling from both sides of the loading area and six operator booths. The design shows room for 32 riders - 16 rows or two. The design did not show how large or fast the new ride would be. 'We have plans to make a major announcement within upcoming weeks,' Brain Edwards said. The Oceania/Aquatic stadium will remain in operation next season."
Also GTTP was quoted as well. Sorry I don't have the link, I just couldn't find it this morning. Take this as you will :)
Later
shoewee/Goldberg
http://shoewee.tripod.com