New Ride History

Shawn Mariani

CP gets a new ride every year on average. If you look at it, when they got MF, the year before hand, what did they get. A small ride, i believe it was Chaos. I may be wrong. But its almost a set up. When they plan constuction for a big exspenive ride, the year before hand's ride is rather small and cheap. I know wicked twister is a sweet ride, but look at it. It looks rather cheap to contruct compared to other rides. Does this mean that this next ride is gona be huge? maybe im wrong.
+0

gatechboy20

9 million is very cheap.
+0

Jeffrey P. Stoneking

$9 Million cheap?! I'm glad you think so.

Mariani, you didn't take into consideration that property expansions have also transpired during the past few years. I wouldn't try to find a particular sequence in capital investments.

+0

Crow_T._Robot

Actually the year before mille they got Camp Snoopy (8 rides including a coaster). the year before it was Power Tower and the year prior was Chaos.

"They'll See Everything, They'll See The Big Board."

+0

Big D

How much did they spend on that project?

This year they built a record breaking coaster....before the millie it was a small junior coaster. this probably is cheaper than the MF.

------------------
- Dennis

+0

Gravity

{sarcasm}Because everyone knows that a ride is only good if it costs more than the ride before it.{/sarcasm}

------------------
gravity: down to earth, without the sugar coating.

www.geocities.com/gravityjmb

+0

Shawn Mariani

i was just thinking, that maybe there was a pattern in their expenses. was the comment about 9 million being cheap sarcasim? hmm.. well anyway.. is it really possilbe that this new ride is cheaper then MF?
+0

Anonymous

Well, Wicked Twister didn't cost nearly what MF did, and it was built after. So, sure Shawn.

------------------
BTS Cedar Point
http://www.btscedarpoint.tk

+0

You must be logged in to post

POP Forums app ©2025, POP World Media, LLC - Terms of Service