New pics on their website. Final peice of track in place!
They also have the parts for the entrance ramp.
----------------- "Who needs drugs when you have Cedar Point." MF 9 S:UE 8
*** This post was edited by kakarot on 2/19/2002. ***
Sweet, thanks for telling us!
Ah yes...Wicked Twister stands poised and ready to serve the thousands of riders this season...I can't wait...Just need to get that electrical work and line in place and the testing will begin...I like to look at the very early pictures to see how far along they really have come with that ride...
I do too, Raptor_Rider. I hope they take a new picture from the top row of the Aquatic Stadium so we can compare, like a before and after. ----------------- ...That was Schwabinchen' awesome!!