------------------
Guess who's back....back again ;)
Yellow tower up, but going to go higher b/c big yellow supports are still in staging area and construction site. Solid red track on one side of tower, red & white pieces on other side, this will probably be where trains will launch up the top-hat at max speed. Lots of grey supports near ground level in two parallel lines. More twisted track and up curving track sighted, probably for top-hat. No track sighted that curve left or right (for those not in the know, the two rails w/ stripes painted on is where the trains will ride). The only left/right curving track I've seen is light-duty (non-boxed) track, probably for transfer or return back to loading station.
This leads me to conclude (so far) that this ride will be L-TH-B. Still not known if the top-hat will be inverted or not, but I hope it will be inverted (going over the top), as I want air time while seeing the ground far below.
*** This post was edited by Kevin Lehman 10/13/2002 6:02:06 AM ***
------------------
Im a lurker....
------------------
I'd rather die living than live like I'm dead
------------------
Im a lurker....
http://www.guidetothepoint.com/cpplace.aspx?mode=thread&TopicID=8950
------------------
Guess who's back....back again ;)
You must be logged in to post