New Maverick Photos in the construction diary.
eat. sleep. ride! - Coaster apparel and accessories!
Ride on, MrScott!
Being Cedar Point I am sure they have everything planned out and ready for opening day. Though it still surprises me how much work is still going on at the park. With opening day a mere 8 days from now, I would think they would be doing minor touchups now, and not still working like madbeasts. Is this normal for them?
Either way the ride will be a lot of fun or in the least very attractive.
I think that Cedar Point will load Two Trains, send both out, one will go up the lift, and the second will wait until the other train hits the tunnel and then go up the lift.
So two trains wait outside the station, two are in the station, one is right outside the front of the station, and the other is on the course.
Saturday May 12 2007
All Valleyfair Released to the World
You must be logged in to post