I have been waiting for them to put up the webcams for a while and now that there back up it looks as if there done with the pull through and was wondering what will be next? Will they test the train?
1: how do you know for sure they are done
2: It all depends on if they are done with all the wiring, power supply and controls needed to run the ride. My personal judgement would be that they do not have most of that done and it will be awhile untill the start sending trains out. According to one interview with Monty Jasper the transformers required to run the ride were not due in till the end of the month plus time to set it in place and wire it. Also if the LSMs are anything like the LIMs on WT they will probably not want to work well with the current low temprature.
Im excited for Cedar Point to finally finish the pull through, but I'll be even more thrilled to see how they conquere the second pull through with all of the themeing elements put together. It should be quite the obstical for the park, but Im sure they have a gameplan on how they can get the Job Done...
"Baby I'm ready to go!" Dragster 2004
I don't think its as much as an obstacle as you put.
-Craig-
2008:Magnum XL-200 | Top Thrill Dragster
2007:Corkscrew | Magnum XL-200 | Maverick
You must be logged in to post