Adding trains to the operation only makes sense if there is idle time in the station (no train to load, employees just hanging around). If the station has a continuous workload, it doesn't matter if you are running 3 trains or 30 trains. The capacity will be determined by the time it takes between two successive dispatches.
olympic10086 said:
I totally agree, Dan! I'd love to see it as a Floorless
Mikey
-----------------
That's what I've been saying all summer, but not as a floorless, as that would require a retrofit of the whole station. I'd say throw some sitdown trains on there, and we're ready to roll.
Josh
-----------------
-------------
I was super before Superstew was cool!
*** This post was edited by vegasbaddboy on 11/15/2001. ***
You must be logged in to post