Though I'm not sure they'll ever hit 2 million in a season, it is good to know that TTD has increased it's ridership every year since it opened. Not to say that I want to wait in line, quite the opposite. The increased ridership obviously means it has been running better, more consistantly and the crews are doing a great job too.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
It's somewhat amusing and depressing that, in line, there is a sign that says Dragster would give 2 million rides in it's inagural season.
884 Coasters, 35 States, 7 Countries
http://www.rollercoasterfreak.com My YouTube
^^Yup I was going to say that, didn't only get around 500,000...
Also those signs need replaced there color is fading, also I notice two weekends ago while in line that the last speaker by the ramp is broken, has this been the case for most of the year?
*** Edited 10/2/2007 12:17:12 AM UTC by ChrisC.***
Jason Hammond said:
It's somewhat amusing and depressing that, in line, there is a sign that says Dragster would give 2 million rides in it's inagural season.
It does say "estimated". But when the sign was made I guess it wasn't estimated that the ride couldn't run 6 trains that could all move together, and the launch system would tear itself apart one month after it opened.
-Craig-
2008:Magnum XL-200 | Top Thrill Dragster
2007:Corkscrew | Magnum XL-200 | Maverick
Congrats to those guys. Jen sure did a great job, and of course the crew. I wish we were that good when I worked Dragster.
2009-Maverick TL
2008-Thunder Canyon TL
2007-Top Thrill Dragster (Halloweekends)
2006-Top Thrill Dragster
2005-Top Thrill Dragster, Magnum XL-200, MaXair (Halloweekend Fridays), Shivering Timbers TL
2004-Michigan's Adventure-Shivering Timbers CO-ATL
2003-Michigan's Adventure-Games Attendant
THIS just shows you how extremely excited Tony was to be there on a Sunday!
eat. sleep. ride! - Coaster apparel and accessories!
Ride on, MrScott!
a bit of dragster trivia for you all.....if ttd were to hit intervals 100% of the time with a full train each time operating 100% of this years operating schedule, the rider capacity would be 1,956,283.2 riders. This figure does not inclue early entry. If you're interested on how I came to that figure, let me know.
I'm too sexy for my harness!
You must be logged in to post