I don't think there's any need for worry. If they pull some late nighters (as has been said they would) then they'll get it done in time before opening day. Though all they really need to finish is the concrete and electrical work. I think the stage can technically be worked on after park hours if it were to come to it.
-Adam G- The OG Dragster nut
^Exactly. As I have already said, the stage area can still be worked on while the park is open. The only thing that needs to be done by opening day is that large patch of dirt, which can be poured with concrete the day before the park opens, which has been done before. Some of you need to have faith in the park.
I was in the park last week. It looks like it does every April: Unlikely to be ready for opening day. And yet, somehow, they always make it.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
It is EXTREMELY windy in Sandusky right now, I have lost power 3 or 4 times already. So they were probably just knocked off temporarily due to that.
Morté aka Matt, Ego sum nex
Dragon's Fire Design: http://www.dragonsfiredesign.com
Facebook: http://www.facebook.com/mattdrake
It looks like a problem with the website. The cams are still up. Here are the links.
Pagoda
http://174.121.245.214/cp/PagodaCam_1024.jpg
Luminosity Area
http://174.121.245.214/cp/halloweekendsCam_1024.jpg
Or maybe it isn't a problem at all, and they just removed them from the public page while they reposition them or giggle at people posting on a Web site about their removal.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
It will be moved. I forget exactly, but I think it's going either behind or next to the stage.
Jeff - Advocate of Great Great Tunnels™ - Co-Publisher - PointBuzz - CoasterBuzz - Blog - Music
You must be logged in to post